← Reading room

Working translation · English

Folio 24v

Translated into English from the project’s earlier German interpretation. That interpretation assigned meanings to recurring forms and drew context from the pictures; it is not a confirmed decipherment.

1

Adjust and take; from the source material; as an execution step; at the indicated location. Take the plant item and take it; as an execution step and at grade I; at the indicated location. Insert the same plant item; as an execution step and as an execution step; at the indicated location. Hold the same plant item; as an execution step; at the indicated location. Take the plant item twice and insert it. Insert the same plant item and hold it; as an execution step and as an execution step; close the step.

German draft and manuscript text

German working draft

Stelle ein und nimm; vom Ausgangsmaterial; als Ausführung; an der bezeichneten Stelle. Nimm den Pflanzenposten und nimm ihn; als Ausführung und auf Grad I; an der bezeichneten Stelle. Setze denselben Pflanzenposten ein; als Ausführung und als Ausführung; an der bezeichneten Stelle. Halte denselben Pflanzenposten; als Ausführung; an der bezeichneten Stelle. Nimm den Pflanzenposten zweimal und setze ihn ein. Setze denselben Pflanzenposten ein und halte ihn; als Ausführung und als Ausführung; schließe den Schritt.

Manuscript transcription behind this passage

tchodar chocfhey opom shod chcphy opshody

The original interpretation expands these groups through its proposed vocabulary and carried context. The English translates that interpretation; it does not add a new Voynich word meaning.

2

Take the work unit and the working value and insert the work unit and the working value; as an execution step. Within the current operation, insert the same working value; as an execution step. Add the same working value. Within the current operation, add the same working value; as an execution step. Within the current operation, add the same working value; at the indicated location. Select the plant item; to the target location.

Take the work unit and add it. Within the current operation, add the plant item. Within the current operation, add the same plant item; in the indicated class. Take the work unit; at the indicated location. Then, within the current operation: take the same work unit; continue the operation. Then: mark the same work unit; at the indicated level.

Then: take the same work unit and select it; as an execution step. Set up the same work unit in the work procedure and take it; as an execution step; at the indicated location. Set up the same work unit in the work procedure and take it; as an execution step. Take the plant item and adjust it; through the connection in the plant entry; as an execution step. Take the same plant item and select it; as an execution step and at grade II; at the indicated location. Select the same plant item and select it; from the source material; as an execution step, at grade I, at grade I and at grade I; with the local variant.

Set up the same plant item in the work procedure; at the indicated location. Take the same plant item twice and adjust it. Within the current operation, adjust the plant item; to the target location. Hold the same plant item. Continue: set up the same plant item in the work procedure. Set up the working value in the work procedure.

Within the current operation, set up the working value in the work procedure; as an execution step; at the indicated location. Select the same working value; through the connection in the plant entry; as an execution step; at the indicated location. Within the current operation, select the work unit; as an execution step and at grade I. Within the current operation, select the work unit and the working value. Adjust the same working value and take it; from the source material. Within the current operation, take the work unit; as an execution step.

German draft and manuscript text

German working draft

Nimm die Arbeitseinheit und den Arbeitswert und setze sie und ihn ein; als Ausführung. Im laufenden Gang setze denselben Arbeitswert ein; als Ausführung. Gib denselben Arbeitswert zu. Im laufenden Gang gib denselben Arbeitswert zu; als Ausführung. Im laufenden Gang gib denselben Arbeitswert zu; an der bezeichneten Stelle. Wähle den Pflanzenposten; zur Zielstelle. Nimm die Arbeitseinheit und gib sie zu. Im laufenden Gang gib den Pflanzenposten zu. Im laufenden Gang gib denselben Pflanzenposten zu; in der bezeichneten Klasse. Nimm die Arbeitseinheit; an der bezeichneten Stelle. Danach im laufenden Gang: nimm dieselbe Arbeitseinheit; führe den Gang weiter. Danach: markiere dieselbe Arbeitseinheit; auf der bezeichneten Stufe. Danach: nimm dieselbe Arbeitseinheit und wähle sie; als Ausführung. Setze dieselbe Arbeitseinheit im Arbeitsgang an und nimm sie; als Ausführung; an der bezeichneten Stelle. Setze dieselbe Arbeitseinheit im Arbeitsgang an und nimm sie; als Ausführung. Nimm den Pflanzenposten und stelle ihn ein; über die Verbindung im Pflanzenartikel; als Ausführung. Nimm denselben Pflanzenposten und wähle ihn; als Ausführung und auf Grad II; an der bezeichneten Stelle. Wähle denselben Pflanzenposten und wähle ihn; vom Ausgangsmaterial; als Ausführung, auf Grad I, auf Grad I und auf Grad I; mit der lokalen Variante. Setze denselben Pflanzenposten im Arbeitsgang an; an der bezeichneten Stelle. Nimm denselben Pflanzenposten zweimal und stelle ihn ein. Im laufenden Gang stelle den Pflanzenposten ein; zur Zielstelle. Halte denselben Pflanzenposten. Weiter: setze denselben Pflanzenposten im Arbeitsgang an. Setze den Arbeitswert im Arbeitsgang an. Im laufenden Gang setze den Arbeitswert im Arbeitsgang an; als Ausführung; an der bezeichneten Stelle. Wähle denselben Arbeitswert; über die Verbindung im Pflanzenartikel; als Ausführung; an der bezeichneten Stelle. Im laufenden Gang wähle die Arbeitseinheit; als Ausführung und auf Grad I. Im laufenden Gang wähle die Arbeitseinheit und den Arbeitswert. Stelle denselben Arbeitswert ein und nimm ihn; vom Ausgangsmaterial. Im laufenden Gang nimm die Arbeitseinheit; als Ausführung.

Manuscript transcription behind this passage

ocphoraiin o k o am ydals ckhor shy cho dchor otol otaiir otchos okchom okcho octhyl odchees oesearies okam chcth ydal sh okol okaiin odaiin dlos oeor oraiin tchar oro

The original interpretation expands these groups through its proposed vocabulary and carried context. The English translates that interpretation; it does not add a new Voynich word meaning.

3

Continue: adjust the same work unit and take it; as an execution step. Take the work unit. Select the same work unit; from the source material; at the indicated location. Mark the same work unit. Take the plant item; through the connection in the plant entry; at grade I and as an execution step. Within the current operation, take the material portion; at the indicated location.

Within the current operation, take the same material portion; from the source material; at the indicated location. Continuing the current operation: take the same material portion; as an execution step; at the indicated location. Add the plant item, take it and add it; as an execution step. Take the plant item twice and adjust it. Continue: hold the same plant item. Select the material portion.

Continuing the current operation: select the plant item. Continuing the current operation: select the same plant item. Within the current operation, select the work unit. Take the work unit. Within the current operation, take the same work unit; as an execution step; at the indicated location. Set up the work unit in the work procedure; as an execution step and at grade I.

Take the same work unit and adjust it; at grade I and as an execution step; at the indicated location. Within the current operation, adjust the plant item; in the indicated class. Continue: add the same plant item; at grade I. Within the current operation, add the plant item and the working value; at the indicated location. Take the same working value; from the source material; at grade I. Within the current operation, take the same working value; as a new insertion, as an execution step and as an execution step; at the indicated location and at the indicated location.

Set up the working value in the work procedure; as an execution step; at the indicated location. Add the same working value and hold it; as an execution step. Within the current operation, hold the same working value; from the source material; as an execution step; at the indicated location. Within the current operation, hold the same working value; as an execution step. Hold the same working value; as an execution step. Set up the same working value in the work procedure and take it.

Set up the same working value in the work procedure. Set up the same working value in the work procedure and take it; to the target location. Within the current operation, take the plant item; as an execution step and at grade III. Take the same plant item; through the connection in the plant entry; at grade I and as an execution step. Continuing the current operation: take the same plant item. Within the current operation, take the work unit; as an execution step; at the indicated location.

Hold the same work unit; as an execution step. Within the current operation, hold the same work unit; as an execution step; at the indicated location. Then, within the current operation: hold the same work unit; as an execution step; at the indicated location; to the target location; continue the operation. Mark the same work unit; as an execution step and at the indicated level; at the indicated location. Take the same work unit; at grade II and as an execution step; at the indicated location and at the indicated location. Hold the same work unit; as an execution step.

Hold the same work unit; as an execution step. Within the current operation, hold the plant item. Take the plant item; at grade I. Add the same plant item and take it; as an execution step; at the indicated location. Take the same plant item; to the target location; at the indicated location. Process the plant item; as an execution step.

Then: take the same plant item; continue the operation. Within the current operation, take the working value; as an execution step; at the indicated location and at the indicated location.

German draft and manuscript text

German working draft

Weiter: stelle dieselbe Arbeitseinheit ein und nimm sie; als Ausführung. Nimm die Arbeitseinheit. Wähle dieselbe Arbeitseinheit; vom Ausgangsmaterial; an der bezeichneten Stelle. Markiere dieselbe Arbeitseinheit. Nimm den Pflanzenposten; über die Verbindung im Pflanzenartikel; auf Grad I und als Ausführung. Im laufenden Gang nimm den Materialanteil; an der bezeichneten Stelle. Im laufenden Gang nimm denselben Materialanteil; vom Ausgangsmaterial; an der bezeichneten Stelle. Weiter im laufenden Gang: nimm denselben Materialanteil; als Ausführung; an der bezeichneten Stelle. Gib den Pflanzenposten zu, nimm ihn und gib ihn zu; als Ausführung. Nimm den Pflanzenposten zweimal und stelle ihn ein. Weiter: halte denselben Pflanzenposten. Wähle den Materialanteil. Weiter im laufenden Gang: wähle den Pflanzenposten. Weiter im laufenden Gang: wähle denselben Pflanzenposten. Im laufenden Gang wähle die Arbeitseinheit. Nimm die Arbeitseinheit. Im laufenden Gang nimm dieselbe Arbeitseinheit; als Ausführung; an der bezeichneten Stelle. Setze die Arbeitseinheit im Arbeitsgang an; als Ausführung und auf Grad I. Nimm dieselbe Arbeitseinheit und stelle sie ein; auf Grad I und als Ausführung; an der bezeichneten Stelle. Im laufenden Gang stelle den Pflanzenposten ein; in der bezeichneten Klasse. Weiter: gib denselben Pflanzenposten zu; auf Grad I. Im laufenden Gang gib den Pflanzenposten und den Arbeitswert zu; an der bezeichneten Stelle. Nimm denselben Arbeitswert; vom Ausgangsmaterial; auf Grad I. Im laufenden Gang nimm denselben Arbeitswert; als neuen Einsatz, als Ausführung und als Ausführung; an der bezeichneten Stelle und an der bezeichneten Stelle. Setze den Arbeitswert im Arbeitsgang an; als Ausführung; an der bezeichneten Stelle. Gib denselben Arbeitswert zu und halte ihn; als Ausführung. Im laufenden Gang halte denselben Arbeitswert; vom Ausgangsmaterial; als Ausführung; an der bezeichneten Stelle. Im laufenden Gang halte denselben Arbeitswert; als Ausführung. Halte denselben Arbeitswert; als Ausführung. Setze denselben Arbeitswert im Arbeitsgang an und nimm ihn. Setze denselben Arbeitswert im Arbeitsgang an. Setze denselben Arbeitswert im Arbeitsgang an und nimm ihn; zur Zielstelle. Im laufenden Gang nimm den Pflanzenposten; als Ausführung und auf Grad III. Nimm denselben Pflanzenposten; über die Verbindung im Pflanzenartikel; auf Grad I und als Ausführung. Weiter im laufenden Gang: nimm denselben Pflanzenposten. Im laufenden Gang nimm die Arbeitseinheit; als Ausführung; an der bezeichneten Stelle. Halte dieselbe Arbeitseinheit; als Ausführung. Im laufenden Gang halte dieselbe Arbeitseinheit; als Ausführung; an der bezeichneten Stelle. Danach im laufenden Gang: halte dieselbe Arbeitseinheit; als Ausführung; an der bezeichneten Stelle; zur Zielstelle; führe den Gang weiter. Markiere dieselbe Arbeitseinheit; als Ausführung und auf der bezeichneten Stufe; an der bezeichneten Stelle. Nimm dieselbe Arbeitseinheit; auf Grad II und als Ausführung; an der bezeichneten Stelle und an der bezeichneten Stelle. Halte dieselbe Arbeitseinheit; als Ausführung. Halte dieselbe Arbeitseinheit; als Ausführung. Im laufenden Gang halte den Pflanzenposten. Nimm den Pflanzenposten; auf Grad I. Gib denselben Pflanzenposten zu und nimm ihn; als Ausführung; an der bezeichneten Stelle. Nimm denselben Pflanzenposten; zur Zielstelle; an der bezeichneten Stelle. Bearbeite den Pflanzenposten; als Ausführung. Danach: nimm denselben Pflanzenposten; führe den Gang weiter. Im laufenden Gang nimm den Arbeitswert; als Ausführung; an der bezeichneten Stelle und an der bezeichneten Stelle.

Manuscript transcription behind this passage

tochol chor arsa r ycheol daid dar olom kochky chcthy shol sain ychol chol or chor om okoeor ctheod choy keol ydaiin chear qodom okodaiin ksho foar o sho qokch ok okchal oeeey cheol chol odor sho do otolodal doiir cheeodam sho sho dy dchey kchod dchal ochdy otchol odaiim

The original interpretation expands these groups through its proposed vocabulary and carried context. The English translates that interpretation; it does not add a new Voynich word meaning.

About this English translation

The entire German running-text draft has been rendered in English. Actions, repetitions, grades, inner/outer distinctions, and unspecified objects are retained. Paragraph breaks are editorial.

“Item,” “unit,” and “value” retain the source’s broad terms; they do not identify a species, amount, or object. “Grade” is not a temperature. A “station” is the draft’s proposed place of application. “Execution” means carrying out an operation.

Original German edition and provenance